CITY RAIL LINK: AOTEA STATION

DATE 2020

CLIENT City Rail Link

ENGINEER Link Alliance

HEAD CONTRACTOR Link Alliance

LOCATION Aotea Station, Auckland CBD

work completed

Sansom installed Mapeplan TU PVC membrane system on top of the Aotea Station tunnel roof.

Membrane tested by ILD NZ prior to handover.