DATE OF PROJECT 2020
CLIENT Watercare
HEAD CONTRACTOR The Fletcher Construction Company
LOCATION Papakura
Remove and replace Sika Combi flex to water tank joints.
Working alongside Dominion Constructors, Sansom is delivering the installation of BALCO seismic joint systems across both external and internal areas of Fisher & Paykel Building 5. Our scope includes...
Sansom was engaged by John Holland to install BALCO seismic movement joint systems across the internal and external platform stairways and lift access areas of the new Drury Station...
Our scope covers the supply, preparation, and installation of perimeter flashings to the station platform structure, including setting out, fixing, and sealing joints, laps, and terminations to ensure a...
The now iconic Pacifica Building consists of 57 levels and is 178m high. The team at Sansom was responsible for installing the structure’s waterproofing systems. These included: Two-layer bitumen...