DATE OF PROJECT 2021
CLIENT The Warehouse
HEAD CONTRACTOR Sansom Construction Ltd
LOCATION Auckland
Joint seal to 800m of floor joints using Sika 11fc.
Sansom was engaged by John Holland to install BALCO seismic movement joint systems across the internal and external platform stairways and lift access areas of the new Drury Station...
Our scope covers the supply, preparation, and installation of perimeter flashings to the station platform structure, including setting out, fixing, and sealing joints, laps, and terminations to ensure a...
The now iconic Pacifica Building consists of 57 levels and is 178m high. The team at Sansom was responsible for installing the structure’s waterproofing systems. These included: Two-layer bitumen...
Sansom initially was involved in Commercial Bay, the first stage of CRL. This involved encapsulating the two rail tunnels that converge beneath Queen Elizabeth 2 Square and then re-emerge...