We have successfully completed projects throughout New Zealand, Fiji, Tonga, Samoa, Australia, and Hong Kong.
Applied Sika dust proofing to switch board room.
Sansom installed Mapeplan TU PVC membrane system on top of the Aotea Station tunnel roof. Membrane tested by ILD NZ prior to handover.
Floor joint upgrading.
Applied three coats of Sika 400 n system to walkways.
Applied Sika 400 n coating to the warehouse floor.
Grind wall and floor to remove old paint and concrete laitance. Apply primer coat lay mesh and apply two topcoats of Allnex Aquaguard 101.
Below ground tanking works fully encapsulating the basement and retaining walls.
Concrete repairs to areas of floor joints, corbels for seismic stability.
Application of Equus Chevaline Dexx System to service room floor area.Primer: Chevaline EpistixxBody Coat: Chevaline Dexx + 300gsm fibreglassTop Coat: Chevaline Traxx SHS 2000
Warehouse floor joint repairs.
Removed and replaced old Sika carpark deck system: Scraped off old coating Completed all coating prep works Injected all cracks with Sikadur 52 injection resin Sealed all joints with...
Concrete repairs to warehouse floor joints to allow forklifts a smooth transition over the joints.