Sansom was the Specialist Applicator for the SIKA Car Park Deck project on Inanga Street, Hobsonville, Auckland. Our role included substrate preparation, defect repairs, and applying several Sikafloor products,...
Overview New Zealand’s largest ever construction project, the City Rail Link (CRL) connects external train stations and lines in Central Auckland with underground tunnels and station upgrades. Kicking off...
Sansom helped design a remedial scope and specification for the following work:Installed Vinyl Ester Pool coating system from Allnex and installed Nuralite 3PC system to terraces, ponds and decks....
Extensive use of CFRP to floors, shear walls and columns at University of Auckland science block.
Extensive use of FRP wrap to shear walls during the upgrade of the existing structure.
(FRP) Strengthening to beams.
FRP to double TT beams.
Installed 433m of Sikawrap 930G to columns.
Epoxy coating to septic tank.
Waterproof coating to concrete panels.
Apply Sikafloor 400N inclusive of non-slip aggregate.
Warehouse floor joint repairs.
Applied Sika dust proofing to switch board room.
Floor joint upgrading.
Applied Sika 400 n coating to the warehouse floor.
Concrete floor dust sealer. Grind floor to remove concrete laitance Applied Sika dust sealer Polished with four different polishing pads