Installing the Sikaproof A+ A section of the existing ground floor was cut open to install new pipes to upgrade the building. After the pipes are installed and the...
Overview The Lorne Street student accommodation project blends old and new, preserving the original 1929 heritage building’s historic charm while creating modern living spaces for students. Our Involvement ...
Overview This large-scale industrial project involved the installation of TPO membrane roofing across two connected roofs, covering approximately 1,700 square metres. The scope included managing roughly 90 large plinths...
Overview Built in 1929, the Civic Theatre is the largest surviving atmospheric cinema in Australasia and holds international significance. Maynard Marks approached Sansom to provide a remedial solution to...
At the Auckland Airport Transport Hub, Sansom provided tanking to all the subgrade pits. Note the timber piles which we had to bond the membrane to.
The now iconic Pacifica Building consists of 57 levels, which include 41 hotel rooms, 273 apartments, and is 178m high. The team at Sansom was responsible for installing the...
At Sansom, we pride ourselves on tackling complex, large-scale projects with precision and innovation. As Scott Johnston, our tanking Contract Manager, explains, we’re currently waterproofing ten service pits designed...
Project Overview The Site 6 project is a three-building development in the Wynyard Quarter Innovation Precinct in Auckland, New Zealand. The buildings share a two-level basement and feature a...
Overview/Objective The Sofrana Building, located in Auckland’s Britomart, features a multi-use basement for storag and office spaces for a new supermarket. Due to its multifunctional use, it was paramount...
Overview New Zealand’s largest ever construction project, the City Rail Link (CRL) connects external train stations and lines in Central Auckland with underground tunnels and station upgrades. Kicking off...
Sansom helped design a remedial scope and specification for the following work:Installed Vinyl Ester Pool coating system from Allnex and installed Nuralite 3PC system to terraces, ponds and decks....
Grind wall and floor to remove old paint and concrete laitance. Apply primer coat lay mesh and apply two topcoats of Allnex Aquaguard 101.