We have successfully completed projects throughout New Zealand, Fiji, Tonga, Samoa, Australia, and Hong Kong.
Overview Carlaw Park Student Village, is Auckland University’s most expansive self-catered accommodation. Across the site’s two main residences, it can accommodate 1,604 students. Sansom was approached by the main...
Overview/Objective The Sofrana Building, located in Auckland’s Britomart, features a multi-use basement for storag and office spaces for a new supermarket. Due to its multifunctional use, it was paramount...
Overview New Zealand’s largest ever construction project, the City Rail Link (CRL) connects external train stations and lines in Central Auckland with underground tunnels and station upgrades. Kicking off...
Overview After assisting with design and successfully securing the tender, Sansom took on a large Kāinga Ora project in Auckland’s CBD. The project, located at 139 Greys Avenue, involved...
The first New Zealand Costco store opened its doors in Auckland’s Westgate in September 2022. The chain’s new megastore boasts a grocery store, a food court and bakery, and...
Sansom helped design a remedial scope and specification for the following work:Installed Vinyl Ester Pool coating system from Allnex and installed Nuralite 3PC system to terraces, ponds and decks....
On this project we uplifted the existing asphalt and concrete and then removed the failed membrane from the roof of the underground carpark that is also the tourist bus...
Bituthene 5000 was placed on the carpark ramp to waterproof an area of the building that housed a power transformer. We also used Bituthene liquid membrane to seal around...
On this project we placed a Nuplex two-layer Soprema torch on system, for the first time in New Zealand. The Mini Macaden 1000 fully automated installation system was used...
This project involved laying the Soprema Jardin system supplied by Nuplex at the northern end portal of the Waterview tunnel.
1500m2 two layer butt joint membrane installed with our Mini-Macaden automated torch on membrane machine, which allows us to install torch on membrane at a much faster rate. We...
Sansom Construction completed 2500m2 of Nuralite’s warm roof system across three buildings in St Andrew’s Village in Glendowie, Auckland. Sansom completed the installation of the metal tray deck, vapour...